The project supervision of Xiayong C35 Road (Xiaguang 2nd Road - Wushantou Seaside Section) of Daya Bay, Huizhou, was approved by the project approval department (Huiwan Development and Reform Fund [2015] No. 74), and the tender conditions are now in place and approved according to the approved opinions. Supervision open tender.
Project Number: The project number determined in accordance with the "Tender Schedule Form."
First, the tender project profile
(I) Project Name: Engineering Supervision of Xiayong C35 Road, Daya Bay, Huizhou (Xiaguang Second Road - Wushantou Seaside Section)
(B) Tenderee: Huizhou Daya Bay Economic and Technological Development Zone Public Utilities Bureau
(III) Construction Site: Xiayong Bay, Daya Bay
(IV) Construction cost: RMB 20
(V) Project scale: The project is mainly a through-current project of the current road. The road is generally north-south. The north of the road starts from the current state of Xiaguang Second Road, and the south side of Wushantou has built a green road. The total length of the design is about 575 meters, and the red line width is 30 meters.
(VI) Scope and content of the bid: According to the design documents and relevant materials and instructions provided by the tenderer, including supervision of the construction and warranty phase of Xiayong C35 Road, Xiayong, Daya Bay, Huizhou (specific construction content Based on the construction drawings).
(7) Quality and duration requirements: The quality level is qualified and the duration is 180 calendar days.
(8) Source of funds: 100% financial allocation.
Second, the application conditions
The bidder must have an independent legal person qualification of municipal public works supervisor Grade B or higher (including Grade B) or comprehensive qualification of project supervision Grade A qualification; the requirement for the presence of on-site supervision team must be sound and professional, with 5 or more personnel assigned ,among them:
(1) The supervisor must be a professional supervision engineer registered for municipal utilities (including the project, and the concurrent works can not exceed three);
2. A representative of the chief supervision engineer, who has the professional title of middle and above professional in roads and bridges, and has the qualification for engineering registration, or professional engineer with professional road and bridge and above professional titles, and 3 years or more engineering practice experience ( Those who have obtained the intermediate professional technical titles and are based on the issuance date and are trained in the supervision business shall not concurrently hold Other projects concurrently;
3. There are 2 professional supervision engineers, including 1 professional engineer of municipal water supply and drainage or a title (including engineer), all of whom have the qualification for engineering registration or have professional titles with intermediate and higher professional titles, and 2 years or more engineering practice experience (from Obtained intermediate professional titles from the date of issue.
Guangzhou Etmy Technology Co., Ltd. , https://www.gzdigitaltalkie.com